Baghlan and Kunduz Distribution Networks EPC Project
Itis anEPC project forimprovement of distribution networks in Baghlan and Kunduz, Afghanistan. The scale of construction is to extend the 20kV distribution network and 0.4kV power supply network inboth area. Power demand of 41100 consumers in the two areas can be metwhen the project finished.
The project is consisted of 136km MV line, 115 distribution transformers, 113km LV ABC in Baghlan, and 170km MV line, 145 distribution transformers, 140km LV ABC in Kunduz. The scope of work includes design, supply, erection andcommissioning of LV panel, LV/MV cable and accessories, ACSR and accessories, electric meters and meter box, MV switches, fuses and so on.